| |
| Studio install Studio assembly, includes bolting to a slab if required. |
| Studio floor install Floor frame, yellowtongue and 75cm stumps. |
| Annex deck install Floor frame, floorboards and 75cm stumps. |
| Annex roof install Roof frame, colorbond sheets and posts. |
| Cedar roof lining install Backing installed, cedar cut to length & installed. |
| Extra door Door hung and gapped, per extra door purchased. |
| Packaging disposal Pallet & cardboard removed. |
| |